A wall was added on the west side of the stage which was cut down to about 10"
Cold air ducts were installed
the stage was moved back to the wall and a storage area was built on the east side
The new storage area was sheetrocked and tapped in prepertion for painting
Here we see the edger painting along the pole
Above the kitchen area, the angled wall was moved straight to enlarge that room and the east wall was moved to the outer wall enlarging that room by about 25%
The ceiling tiles were removed and objects covered to protect them as the sheetrock was applied to the walls
While the ceiling was exposed, the plumbers were able to install new drains for the room
Eventually the roofers made holes in the roof
The holes were filled with collectors that lead to the drains installed below.
the ceiling grid received a new coat of paint
In the wall above the kitchen you see two windows which will be fille by the stained glass from St. Timothy's
Here you can see how the upper room extends to the east wall making a hallway by the kitchen
Next to the door in the storage room you see a cabinet has been installed to house the equipment that will control the sound and video and the projector to be mounted from the ceiling

The parish hall,